Main INDICATORS

( INEGI )

COA MAPA

Entity GDP growth

( 2024 )

Crecimiento_del_PIB_de_la_entidad

-0.6%

Entity’s contribution to national GDP

( 2024 )

Contribucion-de-la-entidad-al-PIB-nacional

3.7%

Foreign Direct Investment

( Secretariat of Economy )

FDI share in the entity as a percentage of national total

( January-December 2025 )

Participacion de IED en la entidad al total nacional

1.08%

FDI received

2018-3Q 2025

IED-recibida

9.86

billion USD

Main sectors attracting FDI

3Q 2025

Top 3 countries of investment origin

3Q 2025

Foreign Trade

( Secretariat of Economy )

Export ranking

INEGI 3Q 2025

Lugar de

Main Exports (Secretariat of Economy)

3Q 2025

Employment

( Secretariat of Economy )

Economically Active Population (EAP)

( September 2025 )

Poblacion-Economicamente-Activa-(PEA)

1.5 million

Unemployment rate

( September 2025 )

Tasa-de-desempleo

3.9%

Average monthly salary

1T 2025

Salario-promedio-mensual

$9,470 MXN

Infrastructure

( Secretariat of Economy )

Industrial parks

(2023)

Parques-industriales

109

Highways

( 2022 )

Carreteras

8,763 km

Railways

( 2021 )

Vias-ferreas

2,218 km

in length

Railway Concessionaires 
Ferrocarril Mexicano, S.A. de C.V.
 
Línea Coahuila Durango, S.A. de C.V. 

International airports

Aeropuerto Internacional

5

  • Piedras Negras
  • Torreón
  • Saltillo
  • Venustiano Carranza
  • Acuña

Passenger capacity

Capacidad-de-pasajeros

357,077

Cargo capacity

Capacidad-de-carga

8,180,896

kg

Water resource availability

Disponibilidad-de-Recursos-hidricos

Low

Energy availability

Disponibilidad-de-Energia

Low

10% of Mexico’s total energy is produced in Coahuila,

but blackouts occur when demand increases during hot weather and air conditioning use.

*Quantitative data on energy consumption and production in the state is not available, therefore, qualitative information is used to provide an estimate on the energy availability.

 

Renewable energy projects

Proyectos de energia renovable

photovoltaic and wind

High potential for further development of wind and solar energy due to high solar radiation levels and wind speeds. Coahuila is the fourth largest producer of wind energy in the country, accounting for 6% of national wind production. In solar energy, it is also among the top states, contributing 5% of national solar production.

Households with internet access

( 2022 )

Hogares-con-acceso-a-internet

70%

Human Capital and Quality of Life

( Secretariat of Economy )

Population

( September 2025 )

3.5

millon

Graduates

( 2024-2025 )

Egresados

16,718

STEM graduates

Science, Technology, Engineering and Mathematics

Egresados-STEM

9,448

Years of schooling

Escolaridad

10.9

Perception of insecurity in the state

( ENVIPE 2025 )

Seguridad

37.7%

Connectivity

Short distance to the 3 main customs offices

COA mapa aduanas

Ease of Doing Business Ranking

17st

Ranking-negocios

 in the Doing Business Subnational Mexico 2016 ranking by the World Bank.

Last updateFebruary 2026